ParklandsWe were appointed by EC Harris on behalf of the Academy’s Board of Governors to carry out the w works which involved the partial demolition of the existing pavilion structure to accommodate two new classroom facilities |
||
|
Rochdale CrematouriumThe Grade II listed building was left derelict for around fifteen years with very little maintenance carried out on the property. The project brief was to renovate and refurbish the East lodge which is located at the front of Rochdale Cemetery
|
Gascony Hotel - MineheadWe were asked by the proprietor of the Gascony Hotel in Minehead to aid in the refurbishment of the 2nd phase of the upgrade. We had completed the first phase 10 years ago which included extending the building and he was very impressed with the services and quality of the works and therefore asked us to return. |
|
|
Bespoke Art WorkStorage containers are a common sight on school grounds and playing fields. Schools always have the need to store additional equipment that is too large to store inside, such as seasonal play and sports items, and extra tables and chairs for special events.
|
|
|
City Electrical FactorCity Electrical factors are one of the biggest UK electrical wholesalers and Tomax were delighted when asked to design and refurbish their existing Bury depot. |
||
|
Lower Place Primary SchoolWe were appointed by the school to carry out the conversion of their existing redundant changing room and boiler house into a teaching space with separate meeting area, disabled and pupil WC’s |
||
|
Stay CityStay City is a serviced apartment business in the centre of Manchester. Structural cracking was noted around the building along with spalled and damaged brickwork. Therefore erection of a scaffold to the elevations of the tower block including roof elevations was required in order to carry out the essential repairs to brickwork including investigation of structural cracking, selective re-pointing and cleaning.
|
||
St Bede's Sports CollegeThe project consisted of the refurbishment of the school gym and included a new acoustic suspended ceiling, decoration, new lighting/ventilation installation, renewal of heaters within the gym and sanding and varnishing of the existing timber flooring |
|||
St Peter's SchoolThe project comprised of a single storey extension involving a steel frame to roof structure with 3 layer felt flat roof with pitched roof detail forming an over hang canopy detail. External works consisted of a new soft play area, rainwater harvesting tank, boundary landscaping and construction of a new car park including flood light installation. |
|||
St Stephen's SchoolThe project comprised of a single storey extension involving a steel frame to roof structure with 3 layer felt flat roof with pitched roof detail forming an over hang canopy detail. External works consisted of a new soft play area, rainwater harvesting tank, boundary landscaping and construction of a new car park including flood light installation. |