Case Studies


 

Parklands

We were appointed by EC Harris on behalf of the Academy’s Board of Governors to carry out the w works which involved the partial demolition of the existing pavilion structure to accommodate two new classroom facilities

View Case Study

 

Rochdale Crematourium 

The Grade II listed building was left derelict for around fifteen years with very little maintenance carried out on the property. The project brief was to renovate and refurbish the East lodge which is located at the front of Rochdale Cemetery

View Case Study

 

 

 

Gascony Hotel - Minehead

We were asked by the proprietor of the Gascony Hotel in Minehead to aid in the refurbishment of the 2nd phase of the upgrade. We had completed the first phase 10 years ago which included extending the building and he was very impressed with the services and quality of the works and therefore asked us to return.  

View Case Study


 

 

Bespoke Art Work

Storage containers are a common sight on school grounds and playing fields. Schools always have the need to store additional equipment that is too large to store inside, such as seasonal play and sports items, and extra tables and chairs for special events. 

 

View Case Study

 

City Electrical Factor

City Electrical factors are one of the biggest UK electrical wholesalers and Tomax were delighted when asked to design and refurbish their existing Bury depot.

View Case Study

 

Lower Place Primary School 

We were appointed by the school to carry out the conversion of their existing redundant changing room and boiler house into a teaching space with separate meeting area, disabled and pupil WC’s

View Case Study

 

Stay City

Stay City is a serviced apartment business in the centre of Manchester. Structural cracking was noted around the building along with spalled and damaged brickwork. Therefore erection of a scaffold to the elevations of the tower block including roof elevations was required in order to carry out the essential repairs to brickwork including investigation of structural cracking, selective re-pointing and cleaning.

View Case Study

 

 
 

St Bede's Sports College

The project consisted of the refurbishment of the school gym and included a new acoustic suspended ceiling, decoration, new lighting/ventilation installation, renewal of heaters within the gym and sanding and varnishing of the existing timber flooring

View Case Study

 

St Peter's School

The project comprised of a single storey extension involving a steel frame to roof structure with 3 layer felt flat roof with pitched roof detail forming an over hang canopy detail. External works consisted of a new soft play area, rainwater harvesting tank, boundary landscaping and construction of a new car park including flood light installation.

View Case Study

 

St Stephen's School

The project comprised of a single storey extension involving a steel frame to roof structure with 3 layer felt flat roof with pitched roof detail forming an over hang canopy detail. External works consisted of a new soft play area, rainwater harvesting tank, boundary landscaping and construction of a new car park including flood light installation.

View Case Study